20岁末年禁止观看

      <code id="rublh"></code>
    1. Contact Us

      Contact: Toby

      Mob: +8618921102679

      TEL: +86-510-83394067
      Fax: +86-510-83383382
      E-mail: kdsales@wxkdyr.com
      Address:No.18 Yanyu Road, Qianzhou Town, Huishan District, Wuxi City, Jiangsu Province, China

      Home > Knowledge > Content
      Five-point principle for installing dyeing machine
      Feb 20, 2020

      1. Confirm the location of the dyeing machine, but before installing the dyeing machine, you should reserve space for daily maintenance and operation of the dyeing machine, mainly to facilitate future operations, as well as daily maintenance and maintenance.

      2. The installation of the dyeing machine should be on a firm and flat ground, and the dyeing machine can be fixed with special screws for the ground feet.

      3. After the location of the dyeing machine is determined, it is good to use a special instrument to carry out a detailed test on the dyeing machine again, mainly to check the level. If the dyeing machine does not meet the requirements, the It can only be installed after the levelness is correct.

      4. When connecting the power cord of the dyeing machine, all three-phase and four-wire can be placed in a dedicated wire box.

      5. In the process of installing the dyeing machine, we can connect it to the corresponding ground, mainly to ensure that the dyeing machine can be safe and reliable in daily operation.

      http://www.jpfloodandsons.com/

      Previous: Uses and characteristics of high-temperature jet type skein dyeing machine

      Next: Advantages of loose wool dyeing machine

      20岁末年禁止观看

          <code id="rublh"></code>