1. Confirm the location of the dyeing machine, but before installing the dyeing machine, you should reserve space for daily maintenance and operation of the dyeing machine, mainly to facilitate future operations, as well as daily maintenance and maintenance.
2. The installation of the dyeing machine should be on a firm and flat ground, and the dyeing machine can be fixed with special screws for the ground feet.
3. After the location of the dyeing machine is determined, it is good to use a special instrument to carry out a detailed test on the dyeing machine again, mainly to check the level. If the dyeing machine does not meet the requirements, the It can only be installed after the levelness is correct.
4. When connecting the power cord of the dyeing machine, all three-phase and four-wire can be placed in a dedicated wire box.
5. In the process of installing the dyeing machine, we can connect it to the corresponding ground, mainly to ensure that the dyeing machine can be safe and reliable in daily operation.